North Atlantic route map centred on IcelandNL / GUIDE 02
All training

Flight planning / Foundation

Charts and briefing

A chart is not decoration; it is the shared plan between pilot and controller.

10 minSELF-PACEDGUIDE 02 / 09
02Northline Training
Field guide

Operational brief

A chart is not decoration; it is the shared plan between pilot and controller.

A beginner-friendly workflow for AIRAC alignment, enroute planning, airport charts, SIDs, STARs, approaches and a chart pack that stays useful in flight.

On completion

01Build a complete chart pack for an IFR sector
02Read the critical parts of a procedure
03Keep charts, flight plan and avionics aligned

01 / One navigation picture

Start by making every system speak the same AIRAC.

Navigation data changes on a regular AIRAC cycle. The flight planner, charts and aircraft database should represent the same cycle wherever possible; otherwise a waypoint, airway or procedure may appear in one place and be missing or renamed in another.

Before programming, confirm the chart revision and the navigation-data cycle shown by the aircraft. If the cycles differ, do not blindly force a generated route into the FMS. Rebuild it with procedures and fixes that are current in the system you will actually fly.

  • Check the aircraft navigation database cycle
  • Check the planner and chart cycle
  • Resolve missing or changed fixes before connecting

02 / Build the pack

Arrange the flight in the order you will need it.

Begin with the departure airport chart and parking position, then collect the expected taxi, departure, enroute, arrival, approach and destination airport charts. Add the alternate airport and likely approach rather than waiting until the diversion decision.

In Navigraph Charts, a flight can organize the relevant airport and procedure charts around the route. Pin or otherwise stage the most likely set, but keep alternates available because runway and procedure assignments can change with weather or traffic.

  • Departure airport and taxi chart
  • Expected SID and enroute view
  • Expected STAR, approach and missed approach
  • Destination taxi chart
  • Alternate airport and approach

03 / Read the procedure

Brief from the title to the missed approach.

Confirm the airport, runway, procedure name, revision and aircraft applicability first. Then trace the lateral path in the plan view, read every altitude and speed restriction, and compare the route with the active FMS legs page.

For an approach, identify the initial and final approach fixes, inbound course, navigation source, descent profile, decision altitude or minimum descent altitude, required visibility and the complete missed-approach path. Read notes and limitations before assuming the procedure fits the aircraft or weather.

  • Correct airport, runway and procedure revision
  • Transition and lateral track
  • Altitude and speed constraints
  • Minima and required equipment
  • Missed approach altitude and routing

04 / Turn ink into action

A useful brief predicts the next decision.

State how the aircraft will join the procedure, the first meaningful constraint, expected automation modes and the point where configuration or descent begins. Include the threat most likely to change the plan: wind, terrain, icing, runway condition, traffic or a late runway change.

A departure brief should connect the runway to the initial altitude and first route segment. An approach brief should connect the arrival to the landing criteria and go-around. If the brief cannot explain that sequence simply, the setup is not finished.

05 / Keep it live

The chart remains open after the checklist closes.

Keep the current taxi or flight procedure visible and move the next chart into reach before the workload increases. A moving map can support awareness, but it does not replace reading restrictions, notes and minima.

Annotations can mark an assigned taxi route, holding point, key restriction, minima or a change from the expected plan. Keep markings sparse enough that the original information remains easy to read.

  • Current chart visible
  • Next chart staged
  • Assigned changes marked
  • Aircraft position and active leg cross-checked

06 / When something disagrees

Stop the setup before the mismatch reaches the runway.

If the clearance, chart and FMS do not agree, hold position or ask for time. Confirm the exact procedure and transition with ATC, then correct the route and cross-check it independently. Never solve a database mismatch by accepting an unverified discontinuity or invented waypoint.

Current ATC instructions take precedence over the expected plan, but they do not remove the pilot’s responsibility to understand and safely execute the clearance. Say ‘unable’ and offer a workable alternative when the aircraft database or capability cannot support it.

Release to line

Five checks.
Then fly.

01

Charts, planner and aircraft AIRAC compared

02

Complete departure, arrival and alternate chart pack built

03

Lateral path and every constraint cross-checked in the FMS

04

Minima and missed approach briefed

05

Current chart visible and next chart staged

Primary references

Go to the
source.

Next guide / 03

Keflavík operations

Know the field before the weather makes it feel unfamiliar.

Continue in Northline